Iraivan Floor and Railing

Go out to Iraivan to take a look a the railing being assembled along one of the edges of the temple.

Floor work continues.

Chelliah carves a Bhuta…

A top beam of the railing being placed by hand.


Leave a Comment

Archives are now available through 2001. Light colored days have no posts. 1998-2001 coming later.

Não foi possível conectar: