Readying the Floor

Months ago, with professional help, the GK team added concrete materials to make the original floor in the Media Studio both level and flat. In some places, this required almost 2" of leveler. Now, we are applying the subsequent layers of material in preparation for the ten, 10-foot wide vinyl flooring rolls, that we have on hand from Chicago. These will be installed on the 28th through 30th of this month.
In these photos you see first the blue epoxy super sealer in place, called ChapcoDefender.
That is followed by Chapco MP primer. After that, we will trowel on Chapco SmoothCoat, a cement-based skimming material that forms the basis for the Permabond 4600 vinyl adhesive that glues down the vinyl.
The primer enables the skimcoat to stick to the blue sealer, and the SmoothCoat fills any dips or imperfections, creating a more perfect surface that is compatible with the vinyl adhesive.


5 Responses to “Readying the Floor”

  1. amas32 says:

    RT @KauaiMonastery: New blog post: Readying the Floor http://t.co/gPVeDYlE46

  2. Devi Tandavan says:

    Beautiful work! Thank you for showing us all these steps!

  3. SANJAY SHAIV says:

    awesome

  4. Rajen Manick says:

    Nice work! Beautiful blue floor…

  5. Adi Srikantha says:

    Are you sure you are still on the physical plane. This Media Studio is other worldly beautiful. Hoping to see it up close, after the garden is in. Great manifestation ! And on time and budget.

Leave a Comment

Archives are now available through 2001. Light colored days have no posts. 1998-2001 coming later.

September 2014
October 2014
November 2014
December 2014
January 2014
February 2014
March 2014
April 2014
May 2014
June 2014
July 2014
August 2014
Subscribe to RSS Feed