Media Studio Progress
Currently the focus for the media studio is to complete everything that is required for drywall installation. Today the backdoor is being installed, which will reuse the previous door. The monks spent several days refurbishing the door and building the frame and blocking in which it will hang. The insulation began to go in today as well.
From Our Gurus' Teachings
Archives are now available through 2001. Light colored days have no posts. 1998-2001 coming later.