San Marga Path Earthwork
For a long time we've had a muddy situation at the end of the First World section where the path is low and there is a gate just before Muruga Hill. When we have heavy rainfall, a stream of water forms over the path, which is untenable in the long run.
Our employee Dennis Wong is now terraforming with a bulldozer to lift the path in that section and redirect water to the side. He also just installed a culvert for channeling the stream of water under the path instead of over it.
The first photo below shows the small shrine where we'll soon install a Ganesha murti to watch over the First World section.
2 Responses to “San Marga Path Earthwork”
From Our Gurus' Teachings
Archives are now available through 2001. Light colored days have no posts. 1998-2001 coming later.
March 2nd, 2023 at 4:25 pm
“AUM”!.
March 4th, 2023 at 4:21 am
Aum Namasivayam 🙏🙏🙏