Readying the Floor
Months ago, with professional help, the GK team added concrete materials to make the original floor in the Media Studio both level and flat. In some places, this required almost 2" of leveler. Now, we are applying the subsequent layers of material in preparation for the ten, 10-foot wide vinyl flooring rolls, that we have on hand from Chicago. These will be installed on the 28th through 30th of this month.
In these photos you see first the blue epoxy super sealer in place, called ChapcoDefender.
That is followed by Chapco MP primer. After that, we will trowel on Chapco SmoothCoat, a cement-based skimming material that forms the basis for the Permabond 4600 vinyl adhesive that glues down the vinyl.
The primer enables the skimcoat to stick to the blue sealer, and the SmoothCoat fills any dips or imperfections, creating a more perfect surface that is compatible with the vinyl adhesive.
5 Responses to “Readying the Floor”
From Our Gurus' Teachings
Archives are now available through 2001. Light colored days have no posts. 1998-2001 coming later.
May 20th, 2014 at 8:18 pm
RT @KauaiMonastery: New blog post: Readying the Floor http://t.co/gPVeDYlE46
May 20th, 2014 at 10:10 pm
Beautiful work! Thank you for showing us all these steps!
May 21st, 2014 at 1:07 am
awesome
May 22nd, 2014 at 7:05 pm
Nice work! Beautiful blue floor…
May 23rd, 2014 at 11:48 am
Are you sure you are still on the physical plane. This Media Studio is other worldly beautiful. Hoping to see it up close, after the garden is in. Great manifestation ! And on time and budget.