Media Studio Entryway Progress

The media studio entryway has come a long way in the past few weeks. The more time consuming work of creating all the beams, rafters and sheathing is over and the team has moved ahead quickly with their installation. Here is a look at the roofs evolution from rafters to purlins to sheathing.

Image

After the sheathing is all installed the jagged edge you see will be cut even. Another part of the roof will sit atop the unfinished face of the sheathing that the monks are currently installing.

Image

several weeks ago the rafters were installed

Image

Image

Image

Image

Image

The purlins were then installed along the rafters

Image

Image

These triangular pieces will display wallpaper of S. Rajam\

s artwork seen as one enters and exits the building'

Image

This is the finished joint used to hold the long beams together. The wedges in the middle are pounded in and pull the joint together to lock it.

Image

The second triangular wall piece

Image

The purlins are all screwed down and ready for sheathing

Image

Image

Image

Image

Image

Image

The sheathing goes up relatively quickly

Image

Image

Image

The under side is where it really shines, as the finished side of the sheathing faces down while the other side will be covered with the next layer of the roof