June 24, 2020Recently the monks of the Pillaiyar Kulam have been engineering small improvements to their office building. The main building interior was renovated last year, and now we are working on an addition to the front of the building. This space will house MiniMela items along with all the many shipping and printing supplies.
Sannyasin Shanmuganathaswami takes a look at the recent building progress
A simple space still requires complex building plans
Behind this tarp we find our construction zone
The footings are in and now the insulation for this temperature-controlled room is being installed in the floor
Currently our MiniMela and shipping supplies are stored in less-than-adequate spaces, which are subject to moisture and temperature fluctuations.
After this, our envelopes won\
t come pre-glued due to moisture.'
the insulation which will be applied in three layers. It has the pink panther on it, so it must be good.
}
];