Pillaiyar Kulam Office Construction Update
October 5, 2020Today we bring you an update of the progress on our Pillaiyar Kulam Office construction. As you can see, from the outside, this front addition is looking to be far along. This space will serve us as an upgrade to what is currently a large shipping container. The container is where our Himalayan Academy publications necessities exist, including mailing supplies and stock for our Mini Mela gift shop. Inside this newly created space we find that the insulation and drywall are installed, with the mudding and taping of the drywall well underway. Next we'll be seeing painted walls, flooring, doors and electrical fixture installation. Following that, the cabinets and countertops can be installed. Aum.
The building as seen from the outside, painted and looking great!
Inside we find that the drywall work is moving towards completion
Looking back we see the doorway which leads across the building\
s main entry into a smaller electrical room'
This smaller electrical room houses the building\
s main boxes which get their daytime power from our solar arrays'
}
];