« Return to Archives

Iraivan Temple Lavarock Update - November 28

Aum Namah Sivaya

While the Siplis are busy working on some smaller, detailed projects within the temple, the lavarock wall that surrounds the temple foundation continues its steady progression. The stones on either side of the entry staircase are beginning to look complete on the southern side. The stones along the entire east side of the temple are almost fully in place with the edge along their top almost complete. All the small stones acquired for the very top of the wall have been collected. The West side of the temple is also much further along with an entire row of stone having been added. Aum.

Image

This portion of the lavarock wall near the front steps has progresses quickly

Image

On the other side of the entry steps, it has a little further to go.

Image

The western side of the temple has its third layer of stones completed

Image

Here on the east side, large portions of the wall are looking complete. They still need their cap stones and the joints between the stones will be stained darker.

Image

These small pieces on the ground are the cap stones. A single row of them fits along the top.

Image

Towards the back (north side) of the temple, the wall is about four stones tall at the moment with roughly one or two layers to be added.

Image

Image

}

];

Scroll to Top