« Return to Archives

San Marga Path Earthwork

For a long time we've had a muddy situation at the end of the First World section where the path is low and there is a gate just before Muruga Hill. When we have heavy rainfall, a stream of water forms over the path, which is untenable in the long run.

Our employee Dennis Wong is now terraforming with a bulldozer to lift the path in that section and redirect water to the side. He also just installed a culvert for channeling the stream of water under the path instead of over it.

The first photo below shows the small shrine where we'll soon install a Ganesha murti to watch over the First World section.

Image

Image

Image

Image

Image

}

];

Scroll to Top