Water and Fiber-optic Piping Completion
May 5, 2024The piping to carry county water and fiber-optic cable out to rudraksha grove entrance and out to Iraivan Temple has been completed. The photos show Pradip, our contractor, trenching the final stretch. Yoginathaswami has been following with a GPS survey device to map exactly where the trenches are located.
The final photo shows the water being turned on near Iraivan Temple. Shortly, we'll dig another trench to bring the water next to the temple entrance steps for feet washing.
}
];