For decades our welding tasks temporarily took over spaces dedicated to other needs, which wasn’t ideal. Now with the new Hale Hana metal building, the Siddhidata Kulam is able to dedicate a protected space just for welding, including storage for the equipment. The framing and outside walls are done; now the inside walls, ceiling and wiring are being intalled and covered up. To make the most of space, a staircase was built alongside so that the roof can be used for general storage.