To attend worship at Kadavul Hindu Temple make a reservation here
FRONT GROUNDS ARE OPEN DAILY FROM 9AM to 12PM WITHOUT A RESERVATION

Construction Updates and Outing

A group of us were on Kauai's south side and visited with tortoises in a nature reserve in Koloa. They are raised to be like a replacement for an ancient animal that used to graze in the area and is now extinct. For a long time the entrance walkway just before the Kadavul Temple dhvajasthambha has been congested in the spot where the shoe racks and benches are kept. Our employees have just finished constructing a new covered pad next to the path, where visitors can sit and store their shoes. This will allow a free flow of traffic on the main path itself. In the last photo, the concrete foundation has just been poured for the final extension of the Pillaiyar Kulam building for storing more publications and other Minimela items. Now it will cure for some time.  

3 Responses to “Construction Updates and Outing”

  1. Pethuraja says:

    “AUM”!.

  2. Madan ganesh Velayudham says:

    Aum Namah Shivaya

  3. Sankuthi says:

    Aum Nama Sivaya
    Thank you Swamis for this post.
    Sivaya Nama Aum

Leave a Comment

Archives are now available through 2001. Light colored days have no posts. 1998-2001 coming later.

Subscribe to RSS Feed