Outside the New Siddhidata Kulam Building
Now that the new metal building is finished on the outside, including gutters and drain pipes to move rainwater away from the building, the Siddhidata Kulam is adjusting the surroundings. The ground is now sloped away on three sides, with a slightly lower pathway cut to channel water further away. Narrow concrete pipes already in our possession were laid next to each other to form a wide culvert for diverting a large amount of water out into the nearby orchard. The road over this culvert is the main route for coming to and from the new building.
A round catchment tank is being installed as another source of rainwater storage for emergency use, and we also just purchased a used, large, stainless steel tanker as another source of backup water.
A mound of dirt and mulch is established around the south side of the building to grow plants for a visual barrier.
One Response to “Outside the New Siddhidata Kulam Building”
From Our Gurus' Teachings
Archives are now available through 2001. Light colored days have no posts. 1998-2001 coming later.
August 29th, 2023 at 4:31 pm
“AUM”!.